At the start of August our builder turned up on site and started work.  First up they brought the power and phone up from the street.  The first bit from the pillar box is pretty steep.

IMG 0848 1280x9601 225x300 Construction has started

From the road to the drive way.

Up through the middle of the block.  It looks like they were clearing a driveway.  Now we’ll have to landscape that bit too!

IMG 0836 1280x960 400x300 Construction has started

Such a wide clearing for such a small cable

Tom had to inspect the pits.

IMG 0841 1280x960 400x300 Construction has started

Thomas inspecting the installation

New meter box waiting to be fitted out.  3 phase power should cover anything we want to put in down the track.

IMG 0833 960x1280 225x300 Construction has started

New meter box ready to have meter installed.

Poor little meter box looks so lonely on the bare level building pad.

IMG 0831 1280x960 400x300 Construction has started

Meter ready to go on the wall.